KRITIS Umbrella Act: Obligations, Registration and Deadlines for Operators of Critical Facilities

TL;DR
  • The KRITIS Umbrella Act (Federal Law Gazette 2026 I No. 66) entered into force on March 17, 2026 and regulates the physical resilience of critical facilities in ten sectors; cybersecurity stays in the BSI Act.
  • Operators of critical facilities are affected where their facility is significant for supplying the general public; the standard threshold is 500,000 inhabitants served, and the concrete thresholds come from a KRITIS ordinance that, as of October 2026, is not yet in force.
  • The chain of obligations runs from registration with the BBK: risk analysis after nine months, resilience plan, 24-hour incident reporting and management duties after ten months.
  • The fixed registration date of July 17, 2026 is no longer in the statutory text since the amending act of July 21, 2026; registration is due at the latest three months after a facility counts as critical.
  • Suppliers without a critical facility of their own have no obligations under the law, but they receive requirements from operators, for example on access, emergency power, spare parts and the personnel of external contractors.

The KRITIS Umbrella Act has applied since March 17, 2026, and still many operators do not know when they have to act. The reason: which facilities count as critical is set by an ordinance that, as things stand, is still outstanding. This article shows who is affected, what the law requires, how the deadlines run and what it means for suppliers that do not operate a critical facility themselves. The statements are based on the statutory text on gesetze-im-internet.de and carry the caveat "as of October 2026, please verify against the BBK".

What does the KRITIS Umbrella Act regulate, and how does it fit with NIS2?

The Umbrella Act for strengthening the physical resilience of critical facilities, KRITISDachG for short, transposes EU Directive 2022/2557 on the resilience of critical entities into German law. It was promulgated on March 11, 2026 (Federal Law Gazette 2026 I No. 66) and entered into force on March 17, 2026. For the first time, Germany has a uniform federal framework ensuring that critical facilities can also withstand a fire, a flood, an act of sabotage or a power outage.

In the law, resilience means that a critical facility can prevent an incident, protect itself against it, repel it, respond to it, limit its consequences and recover from it. This is an all-hazards approach. Natural hazards, technical failures, human error and hybrid threats all belong to it.

And cybersecurity? It stays in the BSI Act (BSIG), which implements the NIS2 directive. The Umbrella Act draws the line explicitly: software and IT services that do not directly control, monitor or support the physical processes of the critical service are governed exclusively by the BSIG. An incident that is purely a cybersecurity incident within the meaning of the BSIG also falls outside the Umbrella Act. Operators of critical facilities therefore have to master both: the fence and the firewall.

Aspect KRITIS Umbrella Act (physical) BSIG / NIS2 (cyber)
Protected asset Physical resilience, all hazards Security of network and information systems
Central authority BBK, plus sector-specific authorities BSI
Point of reference Critical facility Entity (essential or important)
Classification KRITIS ordinance of the BMI, standard value 500,000 inhabitants Sector and size; operators of critical facilities are always essential entities
Reporting 24 hours to the initial report, detailed report after one month 24 hours, 72 hours, one month
Evidence Resilience plan and audits on request of the authority Evidence every three years under section 39 BSIG
Management Implementation and oversight duty under section 20 Management duties under the BSIG

The two laws work together. Registration runs through a facility set up jointly by the BSI and the BBK, incidents go to a joint reporting office, and the BBK can request parts of the BSIG evidence from the BSI to check the physical measures. Even so, these are two legal regimes with two catalogues of obligations. If you are responsible for a company with several sites, you should manage both in one management system and not in two binders.

Who is affected? Operators of critical facilities and the threshold

The law applies to operators of critical facilities in ten sectors: energy, transport, finance, social insurance and basic income support for jobseekers, healthcare, water, food, information technology and telecommunications, space, and municipal waste disposal.

An operator is whoever, taking the legal, economic and factual circumstances into account, exercises decisive influence over a facility. A facility is critical if it is significant for the provision of a critical service. A critical service supplies the general public, and its failure would lead to considerable supply shortages or threats to public safety.

How high is the threshold?

Under section 5 paragraph 2, the standard value is in principle 500,000 inhabitants to be served by a facility. "In principle" is meant literally: the Federal Ministry of the Interior (BMI) sets categories of facilities and sector-, industry- or facility-specific thresholds by ordinance. In addition there are categories that count as significant regardless of the threshold. The BMI can also determine in individual cases that a facility is critical although it does not reach the threshold, and the other way round. The federal states can designate additional facilities within their areas of responsibility under their own procedure.

The ordinance is the decisive building block. On May 26, 2026, the BMI presented a draft that follows the existing BSI-Kritisverordnung, adds the space sector and shifts individual thresholds. According to the sources I found in October 2026, the ordinance has not yet been published in the Federal Law Gazette. As of October 2026, please verify against the BBK.

Which exceptions and special rules apply?

Not every sector has the same scope of obligations. In section 4 paragraph 2, the law exempts several groups from large parts of the obligations:

Group What applies
Financial entities under DORA Risk analysis, resilience plan, reporting and management duty do not apply
Information technology and telecommunications sector These obligations do not apply either; the BSIG takes over
Municipal waste disposal Only the risk analysis under section 12 applies
Social insurance and basic income support Only the risk analysis under section 12 applies
Electricity, gas and hydrogen Section 5f of the Energy Industry Act applies instead of the evidence rules in section 16

For all other operators, for example in water, health, food, transport and parts of energy, the full catalogue applies. This article sticks to what applies across industries. The sector articles on energy, water and healthcare further down show the practice of the individual sectors.

Am I affected? Three questions for a self-assessment

The law ties the registration duty to the point at which a facility counts as critical, not to a notice from an authority. You therefore have to check for yourself whether you are affected. Three questions help:

  1. Do you provide a service that supplies the general public and falls into one of the ten sectors?
  2. Does your facility belong to a category of the future ordinance, and do you reach the threshold there (standard value: 500,000 inhabitants served)?
  3. Does your facility already count as critical today under the BSI-Kritisverordnung? Then being affected under the new ordinance is likely but not certain, because thresholds and categories can change.

If the answer to the first question is no, you are not an operator within the meaning of the law. Whether the law still touches you is covered in the section on suppliers further down.

What obligations do operators of critical facilities have?

The law builds a chain: register first, then analyze, then implement and document measures, plus report and provide evidence. Management carries the responsibility.

Registration with the BBK

Operators submit the following information to the BBK under section 8 through the registration facility set up jointly by the BSI and the BBK, at the latest three months after a facility counts as critical: name, legal form and commercial register number, contact details, designation of the facility, sector and critical service, where applicable the category, supply-level values, location, supply area and public IP address ranges, the EU member states concerned, a contact point and the types of critical components in use. The component information goes exclusively to the BSI.

You report changes without delay and at the latest after two weeks; changed supply-level values are reported once a year. The BBK confirms completion of the registration, and the notice is supposed to arrive within four weeks. If you do not register, you risk that the BBK carries out the registration itself after hearing you.

Important for the distinction: registration with the BBK does not replace registration with the BSI under the BSIG. If that one is still open, the article on the missed NIS2 registration explains what applies now.

Risk analysis and risk assessment

Under section 12, you carry out a risk analysis and risk assessment on the basis of the national risk analyses and other trustworthy sources whenever needed, and at least every four years. It must take into account the natural, technical and human-caused risks that can impair the availability of your critical service, plus your dependencies on other operators and the dependency of other sectors on you.

This is the classic risk assessment with different scenarios: flood instead of phishing, power outage instead of ransomware, break-in instead of vulnerability. The method stays the same. You identify scenarios, rate likelihood and impact on the critical service, and decide on treatment. The BMI may set substantive and methodological requirements including templates by ordinance. Check whether something has been published before you write the first draft.

Resilience measures and resilience plan

Section 13 requires proportionate technical, security-related and organizational measures for four goals: preventing incidents, adequately protecting premises and critical facilities physically, responding to incidents and limiting their consequences, and swiftly restoring the critical service after incidents. The state of the art is supposed to be observed, and proportionality takes effort and risk into account as well as the operator's capacity.

The catalogue in paragraph 3 names examples that you can test against your risk analysis:

  • Emergency preparedness to prevent incidents
  • Physical protection of the site: perimeter fencing, resistant facade elements, surveillance of the surroundings, detection devices and access control
  • Crisis management: risk and crisis management procedures, defined alarm sequences
  • Business continuity: emergency power supply and identification of alternative supply chains
  • Personnel security including the staff of external contractors
  • Training and exercises for staff

If you run an ISMS under ISO 27001, you know many of these topics from physical security under ISO 27001 A.7: secure areas, access, protection against environmental threats, supporting utilities. The Umbrella Act goes further because it looks not only at IT rooms but at the facility itself and at restoring the service.

Under paragraph 4, you present the measures in a resilience plan and apply it. The plan must show the considerations behind the measures, and it refers to your risk analysis. You update it when needed and after every new risk analysis. The BBK must provide templates and samples for resilience plans at the latest eight months after the KRITIS ordinance enters into force, so you do not start from zero.

For restoration you need numbers: how long may the critical service be down, and what does a restart require? The business impact analysis is the right tool for that. In ISMS Lite you record sites, rooms and facilities as assets with their dependencies, link risks and measures, and maintain emergency plans and recovery plans in the same system. You map the resilience plan under the KRITISDachG from these building blocks.

Incident reporting: 24 hours

Under section 18, you report incidents without delay and at the latest 24 hours after becoming aware of them to the joint reporting office set up by the BSI and the BBK. An incident is an event that significantly impairs or could significantly impair the provision of the critical service. If it continues, you update the initial report. At the latest one month after becoming aware of it, a detailed report follows.

The report contains the information available at the time on type, cause and possible cross-border effects, in particular the number and share of those affected, the duration so far and the expected duration, and the geographic area affected. The BBK sets details on the procedure and content and publishes them on its website. Reporting duties under other laws remain unaffected.

A power outage with a cyber cause can trigger both regimes. The deadlines from NIS2 then run in parallel. Define in advance who decides in the night shift which report goes out, and record the time of awareness, the assessment and proof of submission in the incident.

Evidence and inspections

The Umbrella Act does not require evidence on a fixed schedule. Under section 16, however, the competent authority can, via the BBK, request parts of the BSIG evidence from the BSI, ask individual operators for further information, and in particular demand the resilience plan. Selection is risk-based, by risk exposure, size of the operator and possible impact. Evidence can be provided through audits, and on request you submit their results including any deficiencies found. Where there are deficiencies, the authority can order a remediation plan.

Good to know: under section 17, certificates, documents and measures that you obtained for other obligations or voluntarily can be used as evidence. What you have already documented for other authorities or customers is therefore not wasted effort, provided it demonstrates genuine resilience measures. An ordinance is supposed to clarify how equivalence works in detail. How BSIG evidence works is explained in the article on NIS2 evidence and audits. Further provisions in section 14 paragraphs 3 to 5 only take effect on January 1, 2030.

Duties of management

Section 20 obliges management to implement the resilience measures under section 13 paragraph 1 and to ensure their implementation through suitable organizational measures. If management breaches this duty, it is liable to its entity for culpably caused damage under the company law applicable to the legal form. The Umbrella Act itself only provides for liability if company law contains no rule on it. In practice this means: the resilience plan belongs on the managing director's desk, with approval, budget and a date each year on which they see the implementation status.

By when do you have to do what? Deadlines and timeline

The deadlines hang on three events: the entry into force of the KRITIS ordinance, the point at which your facility counts as critical, and your registration. This is exactly where many publications differ, so here is a clarification on the registration date.

The original version of the law named July 17, 2026 as the earliest registration date. That date appears in many vendor blogs. The current statutory text on gesetze-im-internet.de, which I reviewed, no longer names a calendar date: the full citation shows an amendment by Article 8 of the act of July 21, 2026 (Federal Law Gazette 2026 I No. 221), and section 8 paragraph 1 obliges registration "at the latest three months after a facility counts as a critical facility". When a facility counts as critical is determined by the ordinance with its cut-off dates. Without the ordinance, no registration deadline starts to run. One source gives July 29, 2026 as the date of the amendment; the text says July 21 (promulgation), and according to a specialist publication the act was published on July 28. The note on gesetze-im-internet.de describes the amendment as "textually documented, not yet finally processed in documentation". As of October 2026, please verify against the BBK.

Date Event Basis
03/17/2026 The Umbrella Act enters into force Art. 11 para. 1 of the enacting act
05/26/2026 Draft of the KRITIS ordinance (comments until 06/16/2026) Draft, as of October 2026 please verify against the BBK
07/21/2026 Amending act removes the calendar date 07/17/2026 from section 8 Federal Law Gazette 2026 I No. 221
Day X KRITIS ordinance enters into force; cut-off dates determine when facilities count as critical Section 4 para. 3, section 5 para. 1, still open
Day X + 4 weeks BBK sets the registration procedure and publishes it on its website Section 8 para. 8
Day X + 8 months BBK provides templates for resilience plans at the latest Section 13 para. 5
Facility counts as critical + 3 months Registration with the BBK, at the latest Section 8 para. 1
Registration + 9 months Risk analysis and risk assessment, then at least every 4 years Section 8 para. 7, section 12
Registration + 10 months Resilience measures, resilience plan, reporting, management duty Section 8 para. 7, sections 13, 18, 20
01/01/2030 Section 14 paras. 3 to 5 enter into force Art. 11 para. 2 of the enacting act

A worked example shows how this looks. Assume the ordinance enters into force on January 1, 2027 and your facility counts as critical from that day. Then you register by April 1, 2027 at the latest. The risk analysis is due nine months later, by January 1, 2028, and the resilience plan with reporting and management duty ten months later, by February 1, 2028. This is a calculation example, not a forecast. If you read dates such as "implementation by spring 2027" in vendor texts, you are looking at assumptions, not statutory deadlines.

Two points should still keep you from leaning back. First, the deadlines run from registration. Whoever registers early starts the clock early. The law does not say explicitly whether submission or the BBK's confirmation counts, so plan from the earlier date. Second, risk analysis and resilience plan take months, even if the legislator gives them nine and ten. If you already know your facilities, you can prepare without waiting for the ordinance.

What does a violation cost? Fines and liability

The fine provision in section 24 is narrower than many blogs claim. The 1 million euros that is often cited as the fine for missing registration applies, according to the statutory text, to something else:

Violation Fine of up to
Non-compliance with an enforceable order of the BBK to provide documents or information on whether the facility is critical (section 8 para. 2 sentence 1) EUR 1,000,000
Not submitting audit results on request, or submitting them incorrectly, incompletely or late EUR 500,000
Non-compliance with enforceable orders of the competent authority under section 16 (information, evidence, remediation) EUR 200,000
Other cases, including late or incomplete registration data and denied access to premises or documents during an inspection EUR 100,000

Notably, the obligations under sections 12, 13 and 18 have no fine offence of their own. A fine only threatens there once the authority issues an order and you do not comply. The authority's real lever is therefore the order, not the fine. That is no free pass, because the authority can enforce remediation by order, and management is liable under section 20. For comparison: for essential entities, the fine range in the BSIG goes up to 10 million euros for violations of security measures and reporting duties (section 65 BSIG). Under section 25, the BMI is supposed to evaluate, among other things, the level of fines two years after entry into force.

What does the KRITIS Umbrella Act mean for suppliers and mid-sized companies?

The good news first: the law only obliges operators of critical facilities. A supplier that delivers a pump controller, a service provider that maintains building technology, or a mid-sized company that manufactures spare parts for a substation has no registration, reporting or resilience plan duty under the KRITISDachG. The bad news: it will feel the requirements anyway, because operators have to pass them on through contracts.

The law itself provides the hints. Section 13 paragraph 3 lists two types of measures that reach directly into the supply chain: identifying alternative supply chains so that the service can be resumed after an incident, and appropriate security management for employees, including the staff of external contractors. An operator writing a resilience plan therefore asks: who supplies critical parts? How long does replacement take? Who may enter the site, and after what screening? And who maintains the emergency power system?

An example: an engineering firm with 100 employees maintains the control technology of a waterworks. The operator classifies the plant as critical. Afterwards it sends its service providers a questionnaire and extends the maintenance contract with rules on access, personnel screening, response times in a fault and stocking of spare parts. Whoever is prepared for these questions saves time and wins contracts.

What you can do now as a supplier:

  • Check your customers. Find out which of your customers could be operators of critical facilities and ask whether and when requirements will come.
  • Document your own availability. You capture emergency power, spare parts stock, deputy arrangements and recovery in a business impact analysis and an emergency plan.
  • Regulate access and personnel. Anyone working on site needs badges, induction and, where applicable, screening. That fits the access and personnel security sections of your ISMS.
  • Prepare questionnaires. A finished security questionnaire with answers on physical protection and emergency preparedness saves days with every customer request.
  • Check your own NIS2 status. Whether you fall under the BSIG yourself depends on sector and size and is a separate question.

Your own upstream suppliers also belong in view, because an operator asks about the whole chain. In ISMS Lite you manage service providers with criticality, contracts and re-assessment and see which suppliers your service depends on.

The law targets the operators' supply chain but does not regulate it directly. Which requirements are placed on you is in the contract, not in the law. This is not legal advice: clarify doubtful cases about being affected and about contract clauses with your legal department or a law firm.

Checklist: Preparing for the KRITIS Umbrella Act

Clarify whether you are affected

  • Critical services and sectors of the company named
  • Facilities listed with supply level (inhabitants served) and locations
  • Comparison with the standard value (500,000 inhabitants) and the draft ordinance carried out
  • Check against the existing BSI-Kritisverordnung documented
  • Legal department or law firm involved in borderline cases
  • Person named to watch the BBK website and the Federal Law Gazette for publication of the ordinance

Prepare registration

  • Operator data, commercial register number, contact point and 24/7 availability clarified
  • Sites, supply areas and public IP address ranges compiled
  • Types of critical components recorded for the information to the BSI
  • Process for change notifications (two weeks) defined
  • Registration with the BSI under the BSIG checked separately

Risk analysis and resilience plan

  • Risk scenarios defined: natural hazards, technical failures, sabotage, break-in, hybrid threats
  • Dependencies on other operators and sectors recorded
  • Downtime tolerances of the critical service derived from the BIA
  • Measures for site protection, access, alarm sequences and emergency power checked against the risks
  • Alternative supply chains and spare parts strategy clarified
  • Security management for staff and external contractors defined
  • Resilience plan written with reference to the risk analysis and approved
  • Training and exercises scheduled with dates

Reporting and evidence

  • Reporting process for 24 hours and the monthly report defined
  • Responsibility named for assessing whether NIS2, KRITISDachG or both apply
  • Contact details for the joint reporting office of the BSI and the BBK stored
  • Existing certificates, audits and concepts that demonstrate resilience measures collected as possible evidence
  • Storage for audit results and remediation plans set up

Management

  • Resilience plan presented to management and approved by it
  • Budget and owners for implementation named
  • Regular report on implementation status scheduled
  • Liability questions in the articles of association and the D&O insurance checked

Common mistakes with the KRITIS Umbrella Act

Relying on July 17, 2026. This date appears in many texts, but no longer in the current statutory text. Anyone who communicates it as a deadline sends the wrong signal internally. Check the current version on gesetze-im-internet.de and with the BBK.

Assuming the law only concerns large corporations. The 500,000 inhabitant threshold is a standard value. The ordinance can set categories and lower or higher sector-specific thresholds, and regional utilities or individual sites can be affected. Check your facilities against the draft and not against your gut feeling.

Mixing physical and cyber. The BSIG regulates IT security and reports for cyber incidents, the Umbrella Act regulates physical resilience. Whoever manages both in one plan still has to recognize which obligation follows from which law. Otherwise the report to the right body or the evidence for the right authority is missing in the end.

Treating the resilience plan as a document instead of an application. The law requires that you apply the plan, not just write it. Without exercises, responsibilities and regular updates, it will not withstand an inspection by the authority.

Overlooking the supply chain. A resilience plan that only looks at your own site ignores the statutory hints on alternative supply chains and external contractors. Operators that do not know their suppliers can neither procure replacements nor control access in an emergency.

Conclusion: Prepare now, before the ordinance arrives

The Umbrella Act is in force, but its deadlines only start with registration, and that depends on the KRITIS ordinance. That is not a pause but a window: you can now clarify whether you are affected, record your facilities and dependencies, prepare a risk analysis and bring management on board. As a next step, a list of your facilities with location, supply level and contact person, compared against the draft ordinance, is enough. ISMS Lite can provide the data basis for this, but nobody takes the assessment off your hands.